Laserfiche WebLink
Mr. Peter Hays,Division of Reclamation, Mining and Safety <br /> March 19, 2019 <br /> (f) The imported material may be temporarily stockpiled in upland areas west of the entrance road <br /> and will be backfilled and graded in accordance with the approved reclamation plan, to <br /> eliminate exposure of groundwater. <br /> (g) The areas to receive the imported material for backfill will be the southeast area(Mining Area <br /> 1) and northwest area(Pond 2 Mining Area), as depicted on the enclosed Exhibit A— <br /> Reclamation Plan Map. <br /> (h) The material will be placed and stabilized with Saltgrass meadow and Cottonwood <br /> replacement in accordance with the approved reclamation plan or for slope reclamation. <br /> If you have any questions regarding this notice please contact me at (719) 239-0974 or at <br /> joel.bolduc@aggregate-us.com. <br /> Sincerely, <br /> S'6�j &�C� <br /> Joel Bolduc <br /> Regional Land and Environment Manager <br /> Enclosures: <br /> Exhibit A—Reclamation Plan Map <br /> Exhibit B—Inert Material Acceptance Policy <br /> Exhibit C—Inert Fill Materials Profile Form <br /> Exhibit D—Affidavit <br /> Page 2 of 2 <br />