My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-08_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2019-04-08_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 11:46:46 AM
Creation date
4/10/2019 7:38:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/8/2019
Doc Name Note
2nd Edit
Doc Name
Reclamation Cost Estimate
From
Tabetha Lynch
To
Brock Bowles
Type & Sequence
SL21
Email Name
TNL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.600 (FND-SF) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.793 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.2962 <br /> <br />Adjusted unit <br />production: 50.24 LCY/hr <br />Adjusted fleet <br />production: 50.24 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $1.720/LCY <br /> <br />Total job time: 18.55 Hours <br />Total job cost: $1,603 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.