My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-08_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2019-04-08_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 11:46:46 AM
Creation date
4/10/2019 7:38:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/8/2019
Doc Name Note
2nd Edit
Doc Name
Reclamation Cost Estimate
From
Tabetha Lynch
To
Brock Bowles
Type & Sequence
SL21
Email Name
TNL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> <br />Task description: Regrade diversion/collection ditches 1.6 acres <br />Site: New Horizon Mine Permit Action: SL21 Permit/Job#: C1981008 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 057 State: Colorado Abbreviation: None <br />Date: 4/8/2019 County: Montrose Filename: 057 <br />User: TNL <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D3K XL - 3P <br />Horsepower: 74 <br />Blade Type: Power Angle Tilt <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $19.57 NA <br />Operating Cost/Hour: $20.91 100 <br />Ripper own. <br />Cost/Hour: $2.30 NA <br />Ripper op. Cost/Hour: $2.11 100 <br />Operator Cost/Hour: $41.52 NA <br />Total unit Cost/Hour: $86.40 <br />Total Fleet Cost/Hour: $86.40 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 800 <br />Swell factor: 1.165 <br />Loose volume: 932 LCY <br />Source of estimated volume: Length from map 2.05.3-1, X-sec from Sec 2.05.3 <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly <br />production: <br />169.6 LCY/hr <br /> <br />Materials consistency <br />description: <br />Consolidated stockpile 1.0 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 5,700 feet <br /> <br />Material weight: 2,900 lbs/LCY <br /> <br />Weight description: Decomposed rock - 50% Rock, 50% Earth
The URL can be used to link to this page
Your browser does not support the video tag.