Laserfiche WebLink
Table L-1 Reclamation Task and Cost Estimate for Phased Bond <br /> Activity Description Time Months Cost $ <br /> Dewatering 29 acre lake. 1.0 22800 <br /> Final backfill and grading of active hi hwall. 3.0 62482 <br /> Facility removal. 0.5 5000 <br /> Topsoil of all disturbed areas above waterline 2.4 acres). 1.0 6344 <br /> Dr land reve etation 2.4 acres). 1.0 1936 <br /> Totals 6.5 $98,562 <br /> DRMS Costs 28%x direct costs 1.8 $27,597 <br /> Total Bond Amount 8.3 $126,159 <br /> The bond for the first ten years of the BRS&G Pit 1 will be $126,159. <br /> BRS&G Pit 1 C-g l.— A,and 15}.n alr.,I'I I <br /> March 2019 L-2 <br />