Laserfiche WebLink
Annual evaporative depletion at mining completion from 145.2 acres of exposed water surface at <br /> the BRS&G Pit 1 is calculated to be 414.5 acre-feet. <br /> Total annual depletions from the gravel mining operations are estimated to be 414.5 acre-feet <br /> during the post mining phase of the operation. <br /> BRS&G Pit I l.liy l.c—k,and-,s.n[la1C,,N 1 <br /> March 2019 G-4 <br />