My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-05_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-04-05_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 9:44:33 AM
Creation date
4/8/2019 7:06:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
4/5/2019
Doc Name
Adequacy Review - Preliminary
From
DRms
To
Blue Mountain Energy, Inc
Type & Sequence
RN7
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCRAPER TEAM WORK <br /> <br />Task description: Regrade D-Portal Area <br />Site: Deserado Mine Permit Action: RN7 Permit/Job#: C1981018 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 2/12/2019 County: Rio Blanco Filename: 001 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $165.84 NA NA NA NA NA <br />Operating cost/hour: $172.14 NA NA NA NA NA <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $31.05 NA NA NA NA NA <br />Unit Subtotals: $369.02 NA NA NA NA NA <br />Number of Units: 6 0 0 0 0 0 <br />Group Subtotals: Work: $2,214.12 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $2,214.12 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 240,000 CCY Swell factor: 1.111 <br />Loose volume: 266,640 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV Operator Study <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 2,743 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: User Provided Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 29.75 LCY Adjusted Capacity: 29.00 LCY <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.