Laserfiche WebLink
ASPHALT <br /> SPECIALTIES CO. <br /> Nelson Mining Resource—Permit No. M-2005-059 April 1, 2019 <br /> Technical Revision No. 2 (TR-02) Page 3 <br /> finished and reclamation of the Site is ongoing or complete, ASCI is required to maintain a 150-foot <br /> distance from future well location to the beginning of the reservoir. Therefore, the 150-foot <br /> boundaries around the three (3) oil & gas operational area features, along with pipeline easements <br /> and access ROW, remain part of the reclamation plan for the Site. No significant changes have been <br /> made Exhibit F — Reclamation Plan Map other than the removal of the oil & gas wells and <br /> equipment. Well pads, operational areas, pipeline easements, and access ROW have been labeled as <br /> well. <br /> Attachments: <br /> Attachment A COGCC GIS Online Map Screenshots <br /> Attachment B Exhibit C-2 —Mine Plan Map <br /> Attachment C Exhibit F—Reclamation Plan Map <br /> cc: <br /> ASCI File <br />