My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-01_REVISION - M2005059
>
Day Forward
>
Revision
>
Minerals
>
M2005059
>
2019-04-01_REVISION - M2005059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:04:09 PM
Creation date
4/1/2019 2:15:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005059
IBM Index Class Name
REVISION
Doc Date
4/1/2019
Doc Name
Request for Technical Revision
From
Asphalt Specialties Co.
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASPHALT, <br /> =111111 <br /> SPECIALTIES CO . <br /> 10100 Dallas St. • Henderson, CO 80640 • (303) 289-8555 • Fax: (720)289-7707 <br /> TECHNICAL REVISION SUBMITTAL <br /> Date: April 1, 2019 <br /> To: Mr. Eric Scott, P.G. <br /> Environmental Protection Specialist <br /> Department of Natural Resources—Division of Reclamation, Mining, and Safety <br /> From: Mr. Greg Geras, P.G. <br /> Land Resource Manager <br /> Asphalt Specialties Co., Inc. <br /> Permit No: M-2005-059 <br /> Site: Nelson Mining Resource <br /> Address: 6755 County Road 26, Longmont, CO 80504 <br /> Re: Permit I I2c Technical Revision No. 2 (TR-02) <br /> Asphalt Specialties Co., Inc. (ASCI) is submitting this Technical Revision No. 2 (TR-02) to update <br /> Exhibit C-2 — Mine Plan Map for the Nelson Mining Resource (Site). During 2017 and 2018, Kerr- <br /> McGee Oil & Gas Onshore LP (a subsidiary of Anadarko Petroleum Corporation [APQ plugged <br /> and abandoned (P&A) two (2) oil & gas wells and removed the associated flow lines. In addition to <br /> revising the Mine Plan Map, ASCI is submitting an update to Exhibit D — Mining Plan Section (e) <br /> Approximate Mining Timetable to reflect the current conditions and anticipated mining schedule. <br /> ASCI is also submitting an updated Exhibit F —Reclamation Plan Map to reflect the well P&A/flow <br /> line removal activities. <br /> 6.4.3 EXHIBIT C-2 MINE PLAN MAP <br /> As a result of the P&A and removal activities, ASCI is executing its option to mine sand and gravel <br /> in these areas since oil & gas operations are no longer occurring and the potential for impacts is <br /> minimal. The following features have been revised on the Exhibit C-2—Mine Plan Map for the Site. <br /> NELSON 9-31A Well: Located at the north end of the Site in Cell A near the Cell B <br /> boundary, the well has been P&A. The associated flow line and equipment (e.g., tanks and <br /> separator) have been removed. The 75-foot mining setback and 200-foot backfill radii have <br /> also been removed as they are not currently applicable. <br /> HAROLD NELSON UNIT A TRUE 1 Well: Located at the western boundary of Cell A <br /> slightly south of the middle line, the well has been P&A. The associated flow line and <br /> equipment (e.g., tanks and separator) have been removed. The 75-foot mining setback and <br /> 200-foot backfill radii have also been removed as they are not currently applicable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.