Laserfiche WebLink
04 Coto <br /> NTROIC L RADk AMATION MINING AND <br /> 1313 Shy ('olorado 80203 ph(303)866-3567 V •h <br /> PSH/mac <br /> Z019 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET �G <br /> File No.: M- M-1977-256 Site Name: Benson Pit SgFM77 qly <br /> County Grand <br /> TR# jDRtLIS Use only) 3 <br /> Permittee: Grand County Department of Road and Bridge ._ v <br /> n � <br /> o' fV <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Chris Baer, Roads Superintendent <br /> Please provide a brief description of the proposed revision: <br /> This Technical Revision is to allow construction of a Solar Energy Farm (Facility) on a portion <br /> of the southern side of the permit area. Tbe-facility will cover approximately 11.54 acres and <br /> contain the solar panel lease area, buffer zones, (Continued on next page.) <br /> 0 <br /> vo <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application =�h <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or y <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> I IOc, 11 1, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 F1 <br /> 11 Od, 1 12d(1, 2 or 3) $1006 ❑ <br />