Laserfiche WebLink
March 20, 2019 C-1996-083/Bowie No. 2 Mine JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 4 of 9 <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> BRL has needed limited access to the D portal facilities and warehouse during the winter months. So they <br />have only plowed the areas necessary for access. Much of the D-portal area and facilities remain snow covered. <br />This practice has been shown to be beneficial for drainage management. <br /> <br />BRL has been in talks with a third party regarding installing a flaring unit on the previously approved equipment <br />storage area on the slope above (north) of the sealed ventilation fan bench. If this project moves forward, a <br />revision will be necessary to designate this change of use and reclamation plan. <br /> <br />BRL is also considering removal of the coal stockpile footprint at the coal Stockpile pad area. If excavation of this <br />material commences, the mine will need to update to active status. <br /> <br /> <br />DOCUMENTS RECEIVED NA <br />OTHER (SPECIFY) NA <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />