My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-26_INSPECTION - C1981018
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
2019-03-26_INSPECTION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 10:51:03 AM
Creation date
3/27/2019 8:17:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Inspection
Doc Date
3/26/2019
Doc Name
Inspection Report
From
DRMS
To
Blue Mountain Energy, Inc
Inspection Date
3/20/2019
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 20, 2019 C-1981-018/Deserado Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 2 of 9 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection <br />R - Availability of Records <br />N - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />N - Explosives <br />R - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />N - Other <br />R - Processing Waste <br /> <br />R - Roads <br />N - Reclamation Success <br />N - Revegetation <br />N - Subsidence <br />N - Slides and Other Damage <br />R - Support Facilities On-site <br />R - Signs and Markers <br />N - Support Facilities Not On-site <br />N - Special Categories Of Mining <br />Y - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a complete inspection of the Deserado Mine conducted on March 20, 2019. The inspection was <br />completed by Clayton Wein of the Division of Reclamation, Mining and Safety (the Division). Jason Tuttle of <br />Blue Mountain Energy, Inc (BME) was present for the inspection. The weather was clar with a temperature of 45 <br />degrees F. The ground was mostly covered with snow and muddy in some areas. <br />Maintenance Items: <br />- The inlet to the culvert for the RS -1 sump and the ditch above the RS -1 sump have filled with <br />sediment. The Division recommends clearing the blockage in the ditch and cleaning the entire ditch <br />to return it to its designed specifications. Please make cleaning this ditch a priority. <br />- The outlet of the culvert located at the Nitrogen Plant #2 has become buried in sediment and gravel <br />that had washed off of the road. Please locate and clear out the outlet of this culvert to restore it. <br />- The ditch located on the west side of the wash plant bench was full of sediment. The Division <br />recommends cleaning out the ditch as soon as possible to prevent runoff or snowmelt from <br />impacting the facilities. <br />- The drainage ditch along the section of the haul road that connects the main facilities area to <br />County Road 65 had become filled with sediment. The sediment traps, made out of straw bales, <br />were mostly filled with sediment as well. The Division recommends cleaning out the ditch and <br />sediment traps to original design specifications. <br />AVAILABILITY OF RECORDS – Rule 5.02.4(1): <br /> The records for the Deserado Mine are located at the mining office on site. The records were in good <br />condition. Records for the quarterly reports were not up to date. The inspection reports from the Division were <br />also not up to date. Please see the availability of records form attached with the end of this report for more <br />details. Any Items in bold text on the form need to be updated in the mine’s records. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.