My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-26_REVISION - M2005039
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005039
>
2019-03-26_REVISION - M2005039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 8:51:42 AM
Creation date
3/26/2019 1:45:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005039
IBM Index Class Name
REVISION
Doc Date
3/26/2019
Doc Name
Request for Technical Revision
From
Asphalt Specialties Co.
To
DRMS
Type & Sequence
TR2
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASPHALT <br /> SPECIALTIES CO. <br /> Chavers Mining Resource—Permit No. M-2015-030 March 18,2019 <br /> Technical Revision No. 2(TR-02) Page 2 <br /> A copy of the revised Exhibit C-2—Mine Plan Map is provided in Attachment A. Screenshots of the <br /> Colorado Oil and Gas Conservation Commission (COGCC) Geographic Information System (GIS) <br /> Online Mapping database with P&A details for the two (2) wells is provided in Attachment B. <br /> 6.4.4. EXHIBIT D—MINING PLAN <br /> (e) Approximate Mining Timetable <br /> Mining and backfill of Cell C is complete. Currently, the northern portion of Cell B is being mined <br /> and backfilled with operations moving to the south. It is anticipated that Cell B along with the <br /> eastern portion of Cell A will continued to be mined towards the south as depicted on Exhibit C-2 — <br /> Mine Plan Map in Attachment A. Mining will then move to the southern portion of Cell A and begin <br /> moving back towards the north around the outside of the portion of Cell A already mined. An <br /> approximate mining timetable is given in Table 6.4.4-2. However, as aggregate mining and <br /> processing is entirely dependent on market conditions, the mining timetable is an estimated <br /> schedule. <br /> Table 6.4.4-2: Mining Timetable <br /> Mining Cell Size of Mining Cell Approximate Time Until Complete <br /> Cell A 39 acres 5 Years(Partially Mined) <br /> Cell B 23 acres 3 Years <br /> Cell C 4 acres Complete <br /> Total 66 acres 5 Years <br /> Attachments: <br /> Attachment A Exhibit C-2—Mine Plan Map <br /> Attachment B COGCC GIS Online Map Screenshots <br /> cc: <br /> ASCI File <br />
The URL can be used to link to this page
Your browser does not support the video tag.