amendment application be approved in advance of this testing to allow the slide repair work to be <br /> undertaken as soon as possible. <br /> All stormwater that gathers within the quarry will be removed within the statutory 72 hours. If <br /> evaporation is not sufficient, the operator will pump the remaining water to the approved <br /> discharge point on the south side of the site access. See Map C-2 for the pipe route and discharge <br /> point. <br /> EXHHIBIT L -Reclamation Costs (Rule 6.4.12): <br /> I have included with this letter a bond summary sheet for AM04 based on the information/rates <br /> you provided, with the following modifications:I added the adjusted mob/demob task from AM03 <br /> as this was not included, and I added the acreage adjusted revegetation task from AM03 because <br /> our rates seem to differ significantly from those provided(our cost for revegetation also includes <br /> tilling, mulch and reseeding costs). Despite the line item differences, the total amounts don't <br /> appear to be that far apart. <br /> Please provide an updated cost estimate for the fencing listed-the costs provided appear to be <br /> directly from AM03 and are now approximately 4 years old. <br /> Asphalt Paving Co. has recently had similar fencing installed at a cost of$1.84/ft. <br /> EXHIBIT P - Municipalities Within Two Miles (Rule 6.4.16): <br /> Please list any municipality(s) within two miles of the proposed mining operation and address <br /> of the general office of each municipality. Please provide required information for Town of <br /> [Arvada]. <br /> See the revised Exhibit P that is attached. <br /> EXHIBIT S - Permanent Man-Made Structures (Rule 6.4.191: <br /> Please note that roadways and above-ground or underground utilities (i(present) within 200 <br /> feet of the proposed affected area are considered permanent man-made structures. In <br /> accordance with Rule 6.4.19, when mining operations will adversely affect the stability of any <br /> significant, valuable and permanent man-made structure located within 200 feet of the affected <br /> area, the applicant may either: <br /> a) Provide a notarized agreement between the applicant and the persons)having an <br /> interest in the structure, that the applicant is to provide compensation for any damage to <br /> the structure; or <br /> b) Where such an agreement cannot be reached, the applicant shall provide an <br /> appropriate engineering evaluation that demonstrates that such structure shall not be <br /> damaged byactivities occurring at the mining operation;or <br /> c) Where such structure is a utility, the Applicant may supply a notarized letter, on utility <br /> letterhead,from the owners) of the utility that the mining and reclamation activities, as <br /> proposed, will have "no negative effect"on their utility. <br /> Ralston Quarry AM-04 3 cry;Izwic►i and Associate,PIRA' <br />