Laserfiche WebLink
37. On Page G-1, the Applicant states during mining, runoff that occurs within the disturbed <br /> area will be routed to the active mining pit. Please provide a plan describing how water <br /> runofffrom disturbed areas,piled material and operating surfaces will be managed to <br /> protect against pollution of either surface or groundwater both during the after the <br /> operation pursuant to Rule 6.4.7(2)(b). <br /> See the revised surface water discussion in Exhibit G. <br /> 38. On Page G-1, the Applicant states surface and sediment laden water flow barriers include <br /> the pit highwall and topsoil berms and windrows along the pit perimeter. Please provide <br /> construction details for the stormwater control berms and windrows. Please explain how <br /> topsoil berms used as stormwater control structures will be protected from erosion from the <br /> stormwater flow pursuant to Rule 3.1.9(1). <br /> See the revised surface water discussion in Exhibit G. <br /> 39. On Page G-1, the Applicant states there are 7 wells within 600 feet of the Douglas Mountain <br /> Mine. Please state if the Applicant is pursuing well agreements with the existing well owners <br /> within 600.feet of the site. Please provide signed copies of the agreements, if available or <br /> provide evidence the appropriate notice was provided to the well owners. <br /> The applicant will notify all well owners within 600 feet of the mining area of the presence of <br /> mining activity. The applicant will pursue well agreements with any interested well owners. <br /> Notification of well owners and documentation of said notification will be handled in accordance <br /> with CDWR rules and regulations. Most well owners are also structure owners and received <br /> structure agreements from the applicant. Notification for any additional well owners will be <br /> conducted as needed. <br /> 40. On Page G-1, the Applicant states there are 7 wells within 600 feet of the Douglas Mountain <br /> Mine dug to depths below the pit bottom. During the pre-operational inspection, the <br /> Applicant stated a cross-section of the proposed mine site with the well data and monitoring <br /> well data was created to understand the relationship between the wells and the mining <br /> operation. Please provide the Division with a copy of the well cross-section for review. <br /> Additionally,please provide a geologic cross-sections) illustrating the relative depths of the <br /> surrounding wells, the elevation of the West Fork of Clear Creek and the lowest anticipated <br /> pit floor elevation. <br /> The wells and piezometers located on the site have been added to Map C-3. See the revised Map <br /> C-3. <br /> 41. On Page G-2, the Applicant states to handle stormwater in an organized manner, sumps will <br /> be maintained within the site in areas not being actively mined and the site will slope <br /> towards the sumps. Please provide design and operational details for the sumps. <br /> The reference to sumps has been removed from Exhibit G. All stormwater will be contained <br /> within the mining pit to infiltrate or evaporate. <br /> DR1R Aline AM-01 9 � (.nk I rHicA and lsurcielr 1'I I 1 <br />