My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-14_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-03-14_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 8:48:24 AM
Creation date
3/15/2019 10:03:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
3/14/2019
Doc Name
Adequacy Review
From
Tabetha Lynch
To
Clayton Wein
Type & Sequence
RN7
Email Name
TNL
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Ad': 1.000 NA (CAT HB) <br />Job Efficiencv: 0.830 NA (CAT HB) <br />Site Altitude: 5300 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />900.00 <br />4.00 <br />3.00 <br />7.00 <br />1362 <br />0.74 <br />Haul Time: 0.74 minutes <br />Return Rrnrte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />900.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2972 <br />0.37 <br />Return Time: <br />0.37 <br />minutes <br />Total Scraper team cycle time: <br />2.71 <br />minutes <br />Adjusted for job conditions: <br />1,065.83 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,065.83 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />3,197.49 <br />LCY/Hour <br />Unadjusted unit production/hour: 1,284.13 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 3 <br />Unit cost: $0.692 <br />Team(s) Total job time: 83.39 Hours <br />/LCY Total job cost: $184,636 <br />
The URL can be used to link to this page
Your browser does not support the video tag.