PMts Point Emissions (Attachment A)
<br />AIRS
<br />Stack ID
<br />Description
<br />Requested Annual
<br />Monthly
<br />Unit
<br />Emission
<br />Emission Factor
<br />Uncontrolled
<br />Control
<br />Controlled
<br />PT
<br />Throughput
<br />Throughput
<br />Controls
<br />(=our)
<br />(TPY)
<br />Efficiency (%)
<br />(TPY)
<br />$001
<br />Northwest Main (Buffalo Forge)
<br />8760
<br />744
<br />hours
<br />None
<br />1.498880
<br />6.57
<br />0.00
<br />6.57
<br />ventilation fan, 800,000 acfm
<br />5032
<br />Robinson fan, 85,000 cfm fan
<br />8,760
<br />744
<br />hours
<br />None
<br />0.159255
<br />0.70
<br />0.00
<br />0.70
<br />101
<br />(runs only if 5034 is not running)
<br />5033
<br />Jeffrey fan, 600,000 adm
<br />8,760
<br />744
<br />hours
<br />None
<br />1.124160
<br />4.92
<br />0.00
<br />4.92
<br />5034
<br />Industrial Air, 572, 960216- 1,
<br />8,760
<br />744
<br />hours
<br />None
<br />0.281040
<br />1.23
<br />0.00
<br />1.23
<br />150,000 cfm
<br />AIRS
<br />Stack 10
<br />Description
<br />Requested Annual
<br />Monthly
<br />Unit
<br />Emission
<br />Emission Factor
<br />Uncontrolled
<br />Control
<br />Controlled
<br />PT
<br />Throughput
<br />Throughput
<br />Controls
<br />(lbs/ton)
<br />(TPY)
<br />Efficiency (%)
<br />(TPY)
<br />102
<br />5002
<br />Slope Belt (Twentymile Only) •
<br />9,200,000
<br />1,138,978
<br />tons
<br />Full
<br />A0
<br />00018
<br />0.08
<br />90.00
<br />0.01
<br />Stacker Tube Belt
<br />enclosure
<br />103
<br />$003
<br />Stacker Tube Belt •Stacker Tube
<br />11,200,000
<br />1,366,561
<br />tans
<br />Full
<br />enclosure
<br />0 000018
<br />0.10
<br />90.00
<br />0.01
<br />104
<br />5004
<br />Stacker Tube •Stockpile
<br />11,200,ODD
<br />1,386,581
<br />tans
<br />enclosurefull
<br />0.000018
<br />0.10
<br />90.00
<br />0.01
<br />105
<br />5005
<br />R.O.M. stockpile to Reclaim
<br />11,200,000
<br />1,386,561
<br />tons
<br />Partial
<br />enclosure
<br />0.000018
<br />0.10
<br />70.00
<br />0.03
<br />110
<br />5010
<br />Belt conveyor transfer to Tipple 2
<br />11,B00,D00
<br />1,4060,863
<br />tons
<br />Bag House
<br />0.000018
<br />0.11
<br />90.00
<br />0.01
<br />112
<br />5012
<br />Receiving and conveying coal at
<br />2,000,000
<br />247,604
<br />tons
<br />Full
<br />0.00001B
<br />0.02
<br />90.00
<br />0.00
<br />Tipple 2
<br />enclosure
<br />114
<br />5014
<br />R.O.M coal sampling transfers
<br />11,800,000
<br />1,460,863
<br />tan
<br />Baghouse
<br />0.000018
<br />0.11
<br />90.00
<br />0.01
<br />184
<br />S014A
<br />Transfer from Loadout Stacker cv
<br />11,800,000
<br />1,460,863
<br />ton
<br />full
<br />0.000018
<br />0.11
<br />90.00
<br />0.01
<br />to Loadout tube
<br />Enclowre
<br />185
<br />S0146
<br />Transfer from Loadout Stacker
<br />11,800,000
<br />1,460,863
<br />ton
<br />Full
<br />0.000018
<br />0.11
<br />90.00
<br />0.01
<br />tube to stockpile #5
<br />enclosure
<br />117
<br />5017
<br />Secondary crusher transfers
<br />11,800,000
<br />1,460,863
<br />tons
<br />Baghouse
<br />0.000018
<br />0.11
<br />90.00
<br />0.01
<br />186
<br />S017A
<br />Transfer from stockpile #2 feed tv
<br />2 000 000
<br />247,6D4
<br />tons
<br />Partial
<br />0.000018
<br />0.02
<br />90.00
<br />0.00
<br />to stockpile #2
<br />enclosure
<br />187
<br />50176
<br />Transfer from stockpile cv to
<br />2,000 000
<br />247,604
<br />tons
<br />Partial
<br />0.000018
<br />0.02
<br />90.00
<br />0.00
<br />reclaim r
<br />enclosure
<br />122
<br />5022
<br />Batch railcar loadout transfers
<br />9,600,000
<br />1,188,498
<br />tonsFull
<br />enclosure
<br />0.002
<br />10.08
<br />90.00
<br />1.01
<br />123
<br />5023
<br />Pneumatic transfers of rack dust
<br />30,000
<br />3,714
<br />ton
<br />Baghouse
<br />0.071
<br />1.06
<br />99.52
<br />0.01
<br />Into bin
<br />COLORADO
<br />Air Pollution Control Dtvrs:
<br />0.�dpE �hi- Page 19 of 26
<br />
|