PM1p Point Emissions (Attachment A)
<br />AIRS
<br />I Stack to
<br />Description
<br />Requested Annual
<br />Monthly
<br />Unit
<br />Emission
<br />Emission Factor
<br />Uncontrolled
<br />Control
<br />Controlled
<br />PT
<br />Throughput
<br />Throughput
<br />Controls
<br />lbs/hour)
<br />(TPY)
<br />Efficiency (%)
<br />(TPY)
<br />5901
<br />Northwest Main (Buffalo Forge)
<br />81760
<br />744
<br />hours
<br />None
<br />1.498880
<br />6.57
<br />0.00
<br />6.57
<br />ventilation fan, 800,000 acfm
<br />5032
<br />Robinson (an, 85,000 cfm fan
<br />8,760
<br />744
<br />hours
<br />None
<br />0.159255
<br />0.70
<br />0.00
<br />0.70
<br />(runs only if 5034 is not running)
<br />101
<br />5033
<br />Jeffrey fan, 600,000 acfm
<br />8,760
<br />744
<br />hours
<br />None
<br />1.124160
<br />4.92
<br />0.00
<br />4.92
<br />5034
<br />Industrial Air, 572, 960216.1,
<br />8,760
<br />744
<br />hours
<br />None
<br />0.281040
<br />1.23
<br />0.00
<br />1.23
<br />150,000 cfm
<br />AIRS
<br />Stack 10
<br />Description
<br />Requested Annual
<br />Monthly
<br />Unit
<br />Emission
<br />Emission Factor
<br />Uncontrolled
<br />Control
<br />Controlled
<br />PT
<br />Throughput
<br />Throughput
<br />Controls
<br />(lbs/ton)
<br />(TPY)
<br />Efficiency (%)
<br />(TPY)
<br />102
<br />5D02
<br />%ape Belt (Twentymile Only)
<br />9200000
<br />1f 38,978
<br />kons
<br />Full
<br />0,000121
<br />0.56
<br />90.00
<br />0.06
<br />Stacker Tube Belt
<br />,,
<br />,
<br />enclosure
<br />103
<br />5003
<br />Stacker Tube Belt . Stacker Tube
<br />11,200,000
<br />1,386,581
<br />tons
<br />Full
<br />enclosure
<br />0.000121
<br />0.68
<br />90.00
<br />0.07
<br />104
<br />5004
<br />Stacker Tube •Stockpile
<br />11,200,000
<br />1,386,581
<br />tons
<br />Full
<br />enclosure
<br />0.000121
<br />0.68
<br />90.00
<br />0.07
<br />105
<br />5005
<br />R.O.M. stockpile to Reclaim11,200,000
<br />1,386,581
<br />tons
<br />Partial enclosure
<br />0.000121
<br />0.68
<br />70.00
<br />0.20
<br />110
<br />5010
<br />Belt conveyor transfer to Tipple 2
<br />11,800,000
<br />1,4060,863
<br />tons
<br />Bag House
<br />0.000121
<br />0.71
<br />90.00
<br />0.07
<br />112
<br />5012
<br />Receiving and conveying coal at
<br />2 000 000
<br />247,604
<br />tons
<br />Full
<br />0.000121
<br />0.12
<br />85.00
<br />0.02
<br />Tipple 2
<br />enclosure
<br />114
<br />5014
<br />R.O.M coal sampling transfers
<br />11,800,000
<br />1,460,863
<br />ton
<br />Baghouse
<br />0.000121
<br />0.71
<br />95.00
<br />0.04
<br />18450144
<br />Transfer from Loadout Stacker r
<br />i1 800,900
<br />1460863
<br />ton
<br />Full
<br />0.000121
<br />0.71
<br />90.00
<br />0.07
<br />to Loadouttube
<br />, ,
<br />Enclosure
<br />185
<br />S0146
<br />Transfer from Loadout Stacker
<br />11 800,000
<br />1,460.863
<br />ton
<br />Full
<br />0.000121
<br />0.71
<br />90.00
<br />0.07
<br />tube to stockpile #5enclosure
<br />117
<br />5017
<br />Secondary crusher transfers
<br />11,800,000
<br />1,460,863
<br />tons
<br />Baghouse
<br />0.000121
<br />0.71
<br />95.00
<br />0.04
<br />186
<br />Sol 7A
<br />Transfer from stockpile #2 feed cv
<br />2,00a,000
<br />247,604
<br />tons
<br />Partial
<br />0.000121
<br />0.12
<br />80.00
<br />0.02
<br />to stockpile #2enclosure
<br />187
<br />S017B
<br />Transfer from stockpile cyto
<br />2,000,000
<br />247,604
<br />tons
<br />Partial
<br />C.DDp121
<br />0.12
<br />80.00
<br />0.02
<br />reclaim cv
<br />enclosure
<br />122
<br />5022
<br />Batch railcar loadout transfers
<br />9,6DD,0D0
<br />1,188,498
<br />tons
<br />Full enclosure
<br />0.014
<br />67.20
<br />90.00
<br />6.72
<br />123
<br />5023
<br />Pneumatic transfers of rack dust
<br />30,000
<br />3,714
<br />ton
<br />Baghouse
<br />0.47
<br />7.05
<br />99.93
<br />0.01
<br />into bin
<br />LIM COLORADO
<br />Air Pd1 W ion Conrrd Liv4kon
<br />ra wwc�eamtt�.aoern Page 16 of 26
<br />
|