PM Point Emissions (Attachment A) (continued)
<br />AIRS
<br />Stack ID
<br />Description
<br />Requested Annual
<br />Monthly
<br />Unit
<br />Emission
<br />Emission Factor
<br />Uncontrolled
<br />Control
<br />Controlled
<br />PT
<br />Throughput
<br />Throughput
<br />Controls
<br />(lbs/ton)
<br />(TPY)
<br />Efficiency(%)
<br />(TPY)
<br />181
<br />S030CZ
<br />Coal Sampling System Crusher
<br />14,300
<br />1,770
<br />ton
<br />Partial
<br />enclosure
<br />0.020000
<br />0.14
<br />80.00
<br />0.03
<br />182
<br />5030D
<br />Loading Coal to Haul Trucks
<br />2,200,000
<br />272,364
<br />ton
<br />Total
<br />0.026000
<br />30.80
<br />90.00
<br />3.08
<br />(Truck Loadout)enclosure
<br />190
<br />5301
<br />Transfer from Screen/Crusher to
<br />11 200,000
<br />1,386,581
<br />tons
<br />Wet
<br />0.000255
<br />1.43
<br />99.90
<br />0.00
<br />vibe feeder
<br />Scrubber
<br />Transfer vibe feeder to 3 screens,
<br />Wet
<br />191
<br />5392
<br />includes screening and transfer of
<br />2,440,000
<br />302,077
<br />tons
<br />Scrubber
<br />0.160000
<br />195.20
<br />99.90
<br />D.20
<br />product
<br />192
<br />5303
<br />Transfer lntennediatefrom pulley
<br />5,720,000
<br />708,147
<br />tons
<br />Wet
<br />0,000255
<br />0.73
<br />99.90
<br />0.00
<br />cv to raw coal cv
<br />Scrubber
<br />Transfer oversize from pull cv to
<br />Wet
<br />193
<br />5304
<br />crusher, includes crushing and
<br />3,040,000
<br />376,358
<br />tons
<br />Scrubber
<br />0.020000
<br />30.40
<br />99.90
<br />0.03
<br />transfer to raw coal cv
<br />194
<br />$305
<br />Transfer raw coal v to WP#2 feed
<br />8,760,000
<br />1,084,505
<br />tons
<br />Full
<br />0.000255
<br />1.12
<br />90.00
<br />0.11
<br />Cv
<br />enclosure
<br />195
<br />5306
<br />Transfer WP#Z feed cv to vibe
<br />8,760,000
<br />1,084,505
<br />tons
<br />Full
<br />0,000255
<br />1.12
<br />90.00
<br />0.11
<br />feeder
<br />enclosure
<br />1%
<br />5307
<br />Transfer vibe feeder to 2 screens
<br />8,760,000
<br />1,084,505
<br />tons
<br />moisture
<br />0.160000
<br />700.80
<br />45.00
<br />35.04
<br />197
<br />5308
<br />Transfer from overland conveyer
<br />51,246
<br />6,344
<br />tons
<br />Partial
<br />0.000255
<br />0.00
<br />80.00
<br />0.00
<br />to coal sampling system
<br />enclosure
<br />198
<br />5309
<br />Crusher in coal sampling system
<br />51,246
<br />6,344
<br />tons
<br />Partial
<br />enclosure
<br />0.020000
<br />0.00
<br />80.00
<br />0.00
<br />199
<br />5401
<br />Coat transfer to TC truck dump by
<br />2,000,000
<br />247,604
<br />tons
<br />Stilling
<br />0.000255
<br />0.26
<br />85.00
<br />0.04
<br />Wash Plant 91
<br />Shed
<br />200
<br />5402
<br />Transfer From TC truck dump to
<br />21000,000
<br />247,604
<br />tons
<br />Enclosure
<br />0.000255
<br />0.26
<br />90.00
<br />0.03
<br />Plant Feed Belt to WP N1
<br />211A
<br />Stoker reclaim con
<br />600 000
<br />7q,281
<br />tons
<br />Wet
<br />0.000255
<br />0.08
<br />99.90
<br />0.00
<br />screening building transfer
<br />Scrubber
<br />2116
<br />Loading hopperlchute to trucks
<br />600 000
<br />74,281
<br />tons
<br />Wet
<br />0.000255
<br />0.08
<br />99.90
<br />0.00
<br />transfer
<br />Scrubber
<br />211
<br />2110
<br />Screen to reject conveyor transfer
<br />240,000
<br />29,712
<br />tons
<br />Scrueet
<br />0.000255
<br />0.03
<br />99.90
<br />0.00
<br />211D
<br />Reject conveyor to wash
<br />240000
<br />29,712
<br />tons
<br />Wet
<br />0.000255
<br />0.03
<br />99.90
<br />0.00
<br />plant/overland conveyor transfer
<br />,
<br />Scrubber
<br />211E
<br />Screening
<br />600,000
<br />74,281
<br />tons
<br />0.160000
<br />48.0
<br />99.90
<br />0.05
<br />scuebber
<br />COLORADO
<br />a Air Pollution Control Mvimoa
<br />Oemrmrr+dP ft, sm6rmawnm Page 15 of 26
<br />
|