My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-01_INSPECTION - C1981018
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
2019-03-01_INSPECTION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 7:04:43 AM
Creation date
3/4/2019 9:51:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Inspection
Doc Date
3/1/2019
Doc Name
Inspection Report
From
DRMS
To
Blue Mountain Energy, Inc
Inspection Date
2/26/2019
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 26, 2019 C-1981-018/Deserado Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 6 <br /> <br />Photo 1: The second cell of the BSDS#2. Photo 2: The outlet of the Last Chance Pond. <br /> <br />Photo 3: Refuse Pond RP-4. Photo 4: The DP-1 Pond. <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br /> Refuse Piles 2/3/4and 5a were visited during the inspection. RP -2/3/4 was covered with snow and stable. <br />There were no erosional features observed. At the time of the inspection refuse was b eing stockpiled on top of <br />RP -5a. The pile was mostly covered with snow. There w ere no indications of instability or erosion. <br /> <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3), Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5) and <br />(6)/4.03.2(5) and (6), Reclamation 4.03.1(7)/4.03.2(7): <br /> Access roads throughout the mine site w ere well maintained and in good condition. Minimal rutting and <br />ponding of water on the roads was observed. The haul road was in good repair. The supporting drainage ditches <br />were clear of debris and functioning as designed. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> Support facilities inspected included: <br /> <br />- Slot Storage <br />- Nitrogen Plant #1 <br />- RDH-4 <br />- RDH-3 <br />- Main Facilities Area <br />- Conveyor Corridor <br /> <br />Pads for the support facilities were in good condition. Snow had been plowed off and the gravel pads did not have
The URL can be used to link to this page
Your browser does not support the video tag.