My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-28_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2019-02-28_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 11:04:54 AM
Creation date
2/28/2019 11:00:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
2/28/2019
Doc Name
Adequacy Review Response
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
PR12
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response: As a clarification, Maps 23, Mine Plan; 2313, Structures and Renewable Resources; and 23C, <br />Mine Plan — Surface Disturbance and Monitoring; provide relevant mine plan information for the <br />previously completed mining in the Wadge Coal Seam. Maps WC23, Wolf Creek Mine Plan; and <br />WC2313, Wolf Creek Structures and Renewable Resources; provide similar information for the ongoing <br />mining in the Wolf Creek Seam. As noted, there are some inconsistencies in map designations and <br />references, which have now been corrected, the panels are labelled on the maps, and the maps have been <br />updated to include all relevant information. Copies of updated documentation accompany these responses <br />for replacement in the PAP. <br />9. Currently approved Map 23 Wolf Creek Mine Plan Map was last updated with RN7. Please update <br />this map including the state of the underground mine pool, subsidence monitoring areas, additional <br />surface features, and affected area boundary. <br />Response: The relevant maps for the Wolf Creek Seam have been reviewed and updated consistent with <br />the previous response. <br />10. Please Update Map 23 c- Mine Plan Surface Disturbance and Monitoring (which does not appear to <br />depict all items which will be under mined). <br />Response: Please see previous responses to Comments 8 and 9. <br />11. Please update the text in Section 2.05 to include the potential impacts of mining in the PR -12 area on <br />Middle Creek. The creek appears to overly eastern sections of the proposed panels in the Wolf Creek <br />Seam. <br />Response: Section 2.05 has been reviewed and revised to address potential subsidence effects on Middle <br />Creek consistent with the subsidence evaluation provided in Exhibit 7K and extensive experience relative <br />to subsidence effects on area streams. Copies of updated documentation accompany these responses for <br />replacement in the PAP. <br />12. The revised text did not state any changes to the Subsidence Monitoring Program. Panels WC -IRT <br />through WC-4RT will further subside previously subsided areas and some new lands that have not <br />been previously subsided. Please update the text with a section addressing any updates to the existing <br />Subsidence Monitoring Plan, and a new section of text that specifically identifies items overlying the <br />new panels, such as RCR33, that will be included in the monitoring program. <br />Response: When mining began in the Wolf Creek Seam, TC initiated a voluntary subsidence monitoring <br />program, which involves surveying a grid of GPS locations over the potential subsidence area for each <br />panel prior to initiation of longwall mining and then continuing to survey the same grid points during and <br />following longwall mining until no significant additional subsidence is occurring. This is in addition to <br />the specific monitoring for structures and renewable resources that is already in the plan. The relevant <br />text has been reviewed and revised to incorporate a discussion of these ongoing monitoring activities, and <br />text discussions have been added relative to specific structures and resources that could potentially be <br />affected. Copies of updated documentation accompany these responses for replacement in the PAP. <br />13. Proposed revised text included with the application updated the text for the Subsidence Control Plan. <br />The text on P. 2.05-197.3 references the control plan for WC-4RT through WC-9RT. Please revise <br />the text to include all of the planned mining area, panels WC -IRT through WC-9RT. <br />Response: The subsidence control plan text has been reviewed and revised, as appropriate, to include the <br />additional longwall mining areas. Copies of updated documentation accompany these responses for <br />replacement in the PAP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.