Laserfiche WebLink
The Streeter, Prospect and Gulch A Ponds were inspected by State Highway 13. The Prospect Pond was the only <br />pond that held water but no discharge was occurring. The embankments were snow covered but stable. <br /> <br />The Gossard, Rail Loop and Stoker Siding Ponds were inspected. The ponds are located at the Gossard Loadout. <br />Each pond held water and was frozen over. No discharge from the ponds were observed during the inspection. <br /> <br />Prospect Pond. <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br />The South Taylor Pit was relatively inactive at the time of the inspection. The dragline was staged for maintenance <br />along the south end of the pit. <br /> <br />South Taylor Pit. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3), Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5) and <br />(6)/4.03.2(5) and (6), Reclamation 4.03.1(7)/4.03.2(7): <br />Main haul roads to the South Taylor Pit and to the Collom Pit were plowed. Access road and light-use roads <br />access was limited due to snow. <br /> <br />SUPPORT FACILITIES - Rule 4.04: