Laserfiche WebLink
RE: Additional Information-Response-Firestone Gravel Resource, M-1996-052,TR-01 <br /> (Technical Revision for changes to Mining Plan, Reclamation Plan and Bond) <br /> Also as requested, we are providing the slope liner design and schematics(drawings)for the Firestone Gravel <br /> Resource Slope Liner. See the attached Project Manual that was prepared by Deere&Ault for L.G. Everist, Inc. <br /> in July 2010. <br /> If you have any questions or need anything else to process this Technical Revision, feel free to contact me at <br /> 303-286-2247 or Imshults@lgeverist.com. <br /> Sincerely, <br /> �f Lynn Mayyer^AShults'V/6k-� <br /> Regulatory Manager <br /> cc: L.G. Everist(Dennis Fields, Matt Noteboom) <br /> Environment, Inc. (Steve O'Brian) <br /> Attachments: <br /> - RECLAMATION COST REVISION(revised 02108119) <br /> - Firestone Gravel Resource Slope Liner- Project Manual (by Deere &Ault, July 2010) <br /> Digital copy: <br /> - Entire submittal-letter and all attachment emailed to Eric Scott(eric.scott@state.co.us). <br /> FIRE-DRMS-TR-Additionallnfo-Feb2019 <br />