Laserfiche WebLink
Table K-1 Reclamation Task and Cost Estimate <br /> Oki <br /> An <br /> Time <br /> Activity Description Months Cost <br /> Remove All Mining Equipment and Stockpiles 2 $5,000 <br /> Knockdown the mining face at vertical edges to3:1Slope 0.1 $1,200 <br /> Final Grading of3:1 Slopes SOOLF 0.2 $2,000 <br /> Topsoil and Grading of pit floor and side slopes=D,OOOCY@3.00/CY 0.2 $16,000 <br /> Rip Pit Floor and Compacted Areas 0.1 $2,500 <br /> Disc Topsoil, seed, mulch and stabilize mined areas @$150/Acre 9.41 Acres 0.1 $1,410.00 <br /> Totals 2.7 $28,110 <br /> DRMS Costs(25Y6x Direct Costs) $7,027.50 <br /> Total Bond Amount $35,137.50 <br />