Laserfiche WebLink
February 12, 2019 C-1981-035/King Coal Mine BFB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 3 <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br /> Coal waste was being hauled to the top of the disposal pile by a scraper. The material was being <br />compacted with a compactor towed behind a loader. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> The retaining wall by the main air intake appeared to be stable. <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br />PHOTOGRAPHS <br /> Photo 1 – East Pond Photo 2 – Top of the Reach 13 Ditch <br /> Photo 3 – Inlet by the Crusher/Screen Photo 4 – Inlet by the Air Jig <br />Clean Water Treated Water