Laserfiche WebLink
(3) Project water requirements for mining and reclamation: <br /> Water will be needed for dust control and potable water for sanitary needs. Water is hauled <br /> to the site for operational water needs. <br /> (4) Amount of water from each source to meet project water requirements: <br /> Water is obtained from the Operator' s sources off site and/or purchased. Typically, about <br /> 1.8 acre feet of water are used annually, dependent on market demand for the product. <br /> (;) Statement of application for a discharge permit from the Water Quality <br /> Control Division,Department of Public Health and the Environment: <br /> The existing 112 Construction Material operation has a Storm water Discharge Permit. <br /> That permit will be transferred to the proposed 112 Construction Materials Permit. At this <br /> time,a discharge permit is not needed. <br /> r <br /> �l <br />