My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-20_REVISION - M1985129
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985129
>
2019-02-20_REVISION - M1985129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 3:52:58 AM
Creation date
2/21/2019 8:52:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985129
IBM Index Class Name
Revision
Doc Date
2/20/2019
Doc Name
Request For Amendment To Permit
From
Christian Construction
To
DRMS
Type & Sequence
AM2
Email Name
JPL
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) All surface areas of the affected land,including spoil piles shall be stabilized <br /> and protected so as to effectively control erosion: <br /> All surface areas of the affected land will be stabilized and protected so as to effectively <br /> control erosion. The Operator does not plan on having any spoil or overburden piles. The <br /> pit floor will be sloped at a 1%grade which will help prevent erosion and control runoff, <br /> allowing precipitation to infiltrate into the pit floor. All topsoil piles, if not added to or <br /> used within two years,will be seeded withthe approved topsoil stabilization seed mix. <br /> 3.1.7 Ground Water- Specific Requirements: <br /> Ground water is discussed in Exhibit "G". <br /> 3.1.8 Wildlife: <br /> (1) All aspects of the mining and reclamation plan shall take into account the <br /> safety and protection of wildlife on the pine site,and all associated facilities with <br /> special attention given to critical periods forwildlife: <br /> Wildlife use during active mining is not anticipated. Regardless, the Operator will consider <br /> the safety and protection of any wildlife entering the site during mining and reclamation <br /> operations. Finally, no described critical periods or species of concern are known by <br /> Applicant/Operator/Landowner. <br /> (2) Creation of wildlife habitat and management: <br /> The reclamation plan anticipates returning the site to rangeland. <br /> 3.1.9 Topsoil salvage,storage and replacement: <br /> (1) Protection of topsoil: <br /> Topsoil necessary for site reclamation with be removed and placed in stockpiles prior to <br /> mining and removal of any overburden. Topsoil stockpiles will be out of drainage ways, <br /> and away from active mining areas. As stated above,where topsoil stockpiles will not be <br /> disturbed for at least two years,the topsoil stockpiles will be seeded with the approved <br /> topsoil pile seed mix. <br /> (2) Wood vegetation shallbe removed: <br /> The site is a mostly grassland community with little or no woody vegetation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.