Laserfiche WebLink
(c) a signed affidavit certifying that the material is clean and inert,as <br /> defined in Rule 1.1(20); <br /> NA <br /> (d) the approximate dates the proposed activity will commence and end <br /> NA <br /> (e) an explanation of how the backfilled site will result in a post- <br /> mining configuration that is compatible with the approved post-mining <br /> land use; and <br /> NA <br /> (f) a general engineering plan stating how the material will be placed <br /> and stabilized in a manner to avoid unacceptable settling and voids. <br /> NA <br /> (10) All mined material to be disposed of within the affected area must be <br /> handled in such a mannerso as to prevent any unauthorized release of pollutants to <br /> the surface drainage system: <br /> All mined material will be handled in such a manner so as to prevent any unauthorized <br /> release of pollutants to the surface drainage system. All stockpiled material will be located <br /> and managed so as to avoid any uncontrolled runoff. All storm water runoff from the site <br /> will be in accordance with the Operation's updated Stormwater Management Plan. <br /> Therefore, no unauthorized release of pollutants should occur. <br /> (11) No unauthorized release of pollutants to ground water shall occur from any <br /> materials mined, bandied or disposed of within the permitarea: <br /> No ground water pollutants shall be released from the site. Fuel tanks are present on site <br /> but contained by metal retainer basins . If fuel or oil spills occur on site in reportable <br /> quantities,they will be cleaned up. Based on EPA guidance document, an SPCC plan is <br /> not required for this operation. <br /> 3.1.6 Water-General Requirements: <br /> (1) Hydrology and Water Quality: <br /> Ground water is discussed in Exhibit "G". As proposed, the mining and reclamation plans <br /> will not adversely affect surface water hydrology or surface and ground water quality. In <br /> addition, an updated Stormwater Management Plan is being revised and a Stormwater <br /> ;il <br />