My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-13_REVISION - M2000077 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000077
>
2019-02-13_REVISION - M2000077 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 3:36:18 AM
Creation date
2/14/2019 2:04:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000077
IBM Index Class Name
REVISION
Doc Date
2/13/2019
Doc Name
Request For Succession Of Operator
From
PK Enterprises, Inc.
To
DRMS
Type & Sequence
SO1
Email Name
ERR
BJC
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'i <br /> \1U1e Creek Gravel Pit - DccisiOn Notice and FUNSI 15/00 <br /> PaL 6 <br /> Alternative C—This alternative has been selected and is heim-, approved by the <br /> Forest Service. Under the reduced mine size altcrnaM'c. the «rcnel mine WOUld <br /> experience the same site preparation. gravel production. and similar reclamation <br /> process as described above under Alternative B. Hwwever, undcr Alternative C the <br /> size of the expanded quarry and production would be significantly scaled buck and <br /> limited to the portion of the site containing fewer rock Outcrops, thus requiring* less <br /> blasting and crushing to remove and process. It is quite likely that nO blasting would <br /> be required, but if it becomes necessary. the fO11Ow1112- procedures would be followed: <br /> 1. Any blasting would be restricted to the period from November I to <br /> May]. The only exception to this would he if'it is required to maintain <br /> production schedule and to a limited extent during the sunlnler months. <br /> 2. Any blasting would occur during the afternoon hours. <br /> I necessary, blasting would first be coordinated with the Colorado 3. f y, L, <br /> Department of Transportation, Mueller State Park, and neighbors in the i <br /> area. <br /> I <br /> The mine production rates would be approximately the same as under the proposed <br /> action (Alternative B), but only about half of the volume of gravel would be removed, <br /> and the duration and/or intensity of negative impacts would he significantly reduced. I <br /> The use of native species in the seed mix would not allow for the introduction of non <br /> indigenous species, and due to the finer type of material in the northern part ol'the <br /> gravel pit, crushing and screening activities will occur at a smaller scale than under <br /> Alternative B. This will serve to reduce dust and noise impacts. Under Alternative <br /> 1 C, only the northern half of the area included in Alternative B would be reclaimed by <br /> the permittee. However, to meet Forest Service watershed improvement objectives, <br /> opportunities to reclaim the remainder of the previously disturbed area on the <br /> southern part of the existing gravel pit would continue to be a high priority. <br /> Alternative C was chosen for the following reasons: <br /> • The reduced mine size would meet the needs for aggregate in Teller County <br /> with minimal environmental impacts. These impacts would only occur during <br /> the production and initial reclamation phases. <br /> i <br /> • Alternative C is an opportunity to further evaluate the feasibility to reclaim the <br /> south portion of the Mule Creek Gravel Pit. <br /> i <br /> Alternative A was not chosen because it would result in ongoing negative environmental <br /> impacts and would not allow for the reclamation of the existing gravel pit. <br /> Alternative B was not chosen due to concerns about the potential for adverse impacts to j <br /> adjacent property owners from nuisance factors associated with quarry operations over a <br /> lodger period of time than would Occur under Alternative Cl— Although the benefits from <br /> reclamation of the whole area would be preferable, Alternative C will allow the Forest <br /> I <br /> I <br /> i <br /> Hydrosphere Resource Consultants.I002 walnut Suite 200.Boulder,CO 80302 <br />
The URL can be used to link to this page
Your browser does not support the video tag.