Laserfiche WebLink
FS-2800-5(7/95) <br /> OMB NO.0596-0022(Expire 1/31/02) <br /> B. Bond. <br /> Reclamation of all disturbances connected with this plan of operations is covered by Reclamation <br /> Performance Bond No. , dated (mmlddlyy) , signed by (Principal) and (Surety), <br /> for the penal sum of This Reclamation Performance Bond is a guarantee of faithful performance <br /> with the terms and conditions listed below, and with the reclamation requirements agreed upon in the plan <br /> of operations. This Reclamation Performance Bond also extends to and includes any unauthorized <br /> activities conducted in connection with this operation. <br /> The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet. <br /> The bond amount may be adjusted during the term of this proposed plan of operations in response to <br /> changes in the operations or to changes in the economy. Both the Reclamation Performance Bond and <br /> the bond calculation worksheet are attached to and made part of this plan of operations. <br /> Acceptable bond securities(subject to change) include: <br /> 1. Negotiable Treasury bills and notes which are unconditionally guaranteed as to both principle and <br /> interest in an amount equal at their par value to the penal sum of the bond; or <br /> 2. Certified or cashier's check, bank draft, Post Office money order, cash, assigned certificate of deposit, <br /> assigned savings account, blanket bond, or an irrevocable letter of credit equal to the penal sum of <br /> the bond. <br /> C>PC 2P.-za2 �4 S (�2pU�t�EO Ate►� kE "' l_ <br /> (mac -0eJr AAJC.0 <br /> VIL TERMS AND CONDITIONS <br /> A. if a bond is required, it must be furnished before approval of the plan of operations. <br /> B. Information provided with this plan marked confidential will be treated in accordance with the agency's <br /> laws, rules, and regulations. <br /> C. Approval of this plan does not constitute certification of ownership to any person named herein and/or <br /> recognition of the validity of any mining claim named herein. <br /> D. Approval of this plan does not relieve me of my responsibility to comply with other applicable state or <br /> federal laws, rules, or regulations. <br /> E. if previously undiscovered cultural resources (historic or prehistoric objects, artifacts, or sites)are exposed <br /> as a result of operations, those operations will not proceed until notification is received from the <br /> Authorized Officer that provisions for mitigating unforseen impacts as required by 36 CFR 228.4(e) and 36 <br /> CFR 800 have been complied with. <br /> F. This plan of operations has been approved for a period of or until (mmlddlyy) A new or <br /> revised plan must be submitted in accordance with 36 CFR part 228, subpart A, if operations are to be <br /> continued after that time period. <br /> (If more space is needed to fill art a block of information,use additional sheets and attack form) <br /> -9- <br />