Laserfiche WebLink
FS-2800-5(7/95) <br /> OMB NO.0596-0022(Expire 1131/02) <br /> H. Reclamation. Describe the annual and final reclamation standards based on the anticipated schedule 7for <br /> construction, operations, and project closure. Include such items as the removal of structures and facilities <br /> including bridges and culverts, a revegetation plan, permanent containment of mine tailings, waste, or sludges <br /> which pose a threat of a release into the environment, closing ponds and eliminating standing water, a final <br /> surface shaping plan, and post operations monitoring and maintenance plans. <br /> 7 'E /9--' - AC"GJC$ LA a C)141r=S N o-i�-C£ O r� �C 7.S`-1 C i►.t <br /> n041-plick. <br /> VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS i <br /> A. Required changes/modifications/special mitigation for plan of operations: <br /> .-- c�{��-.2p►-y-�C� PLC r��c�P-7�� r-�o7E. d�J PA(2,c �? <br /> Z7'E-fv",.v /�O <br /> (If more space is needed to fill out a block of information,use additional sheets and attach form) <br /> -8- <br />