Laserfiche WebLink
Aggregate Industries South Platte Combined SWSP January 30, 2019  <br />Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, and 5475 Page 2 of 21  <br /> <br />The general location of the mining sites are identified in Table B below and depicted on the                  <br />attached Figure 1.  <br />Table B – Pit Locations <br />Site Name Location <br />Jeronimus Pit Section 16, T2S, R67W <br />Hazeltine Pit Section 9, T2S, R67W <br />Brighton Pit Sections 14 and 23, T1S, R67W <br />Tucson South Pit Sections 1 and 12, T1S, R67W <br />Wattenberg Pit Sections 25 and 36, T1N, R67W; Section 30, T1N, R66W <br />Platte Valley Pit Section 30, T1N, R66W <br />Distel Pit Sections 7, 8, 9, 17 and 18, T2N, R68W <br />Tull Pit Sections 9, 16 and 17, T2N, R68W <br />W.W. Farms Pit Sections 32 and 33, T6N, R66W <br />F-Street Pit Sections 34 and 35, T6N, R66W <br />  <br />This SWSP previously included the Teti Pit (WDID 0203027)and the North Dahlia Pit (WDID                <br />0203028).A plan for augmentation for these two sites was decreed in water court case no.                 <br />2007CW198 on December 17,2013 and all depletions from these sites will be replaced under the                 <br />decreed plan for augmentation.It is noted that the East 8​th Street Pit (M-2000-082,WDID 0303016)is                  <br />no longer a part of this Combined SWSP.Aggregate sold this pit to Superior Oilfields and as of                   <br />November 2012 this pit is no longer covered by Aggregate.All depletions impacting the river are now                  <br />covered under the East 8​th​ Street SWSP (WDID 0302562).   <br />The Tucson Pit (M-1991-140,WDID 0203033)was previously included in this SWSP.Mining              <br />operations at the Tucson Pit have been completed,and a request for a full performance and financial                  <br />warranty release for the Tucson Pit was approved by the DRMS on April 29,2016.A portion of the pit                     <br />(Rogers Reservoir,WDID 0203917)has been lined with a slurry wall and has obtained SEO liner                 <br />approval.All post-pumping depletions have been replaced under previous SWSPs.The remaining             <br />2.0-acre pond is located within the boundaries of the Tucson South Pit and will be accounted for and                   <br />reclaimed under that permit. <br />A summary of the pit operations at each of the ten (10) sites remaining in this SWSP is  <br />provided below. <br />Jeronimus Pit <br />(South Platte  <br />Mainstem) <br />Status: ​Mining operations at the Jeronimus Pit are complete. Operations  <br />on-site include backfilling of the pit with inert fill. Depletions covered  <br />by this SWSP are limited to water lost due to evaporation. The total  <br />surface area exposed at the site is 20.3 acres, of which 14.7 acres were  <br />exposed to the atmosphere prior to January 1, 1981. The 14.7-acre area  <br />exposed at the Jeronimus Pit prior to 1981 is tied to the location as  <br />shown on the exhibit dated January 31, 2011 as provided in the 2011  <br />SWSP. The credits for the pre-1981 area are tied to the location  <br />identified on that map and may not be re-allocated to other areas of  <br />groundwater exposure within the gravel pit permit boundary. <br />Exposed Groundwater Surface:​ 5.6 acres post-81, 14.7 acres pre-81 <br />Active Dewatering:​ No