Laserfiche WebLink
operation or affected land and will thus not be adversely affected. The initial application <br /> submittal features a single proposed mining area, Area 2, within 200 feet of an Xcel powerline. <br /> Updated maps as of 190129 detail a change in Proposed Mining Area 2 that increases the <br /> distance of mining relative to Xcel power poles to 200 feet. <br /> Therefore, the Applicant requests that the above detailed signed and notarized Structure <br /> Agreements completed by the Operator be sufficient to demonstrate that the stability of any <br /> structures located within 200 feet of the operation or affected land will not be adversely affected. <br /> Furthermore, Titan Au intends to utilize the Xcel Energy powerlines along the northern extent of <br /> the site to continue servicing the mine office trailer as well as potential processing equipment <br /> and will thus be within their best interest to maintain adequate buffers around all powerlines on <br /> site. <br /> Please contact us at any time with further questions regarding this response. <br /> Sincerely, <br /> M. Katie Todt, P.G. <br /> Lewicki and Associates <br /> (314) 704-4505 <br /> Ec: Mindy Miller, Titan Au <br /> Enclosures: <br /> - Box Creek Placer 190129-C-1 Current Conditions.pdf <br /> - Box Creek Placer 190129-C-2 Mine Plan.pdf <br /> - Box Creek Placer 190129-17-1 Reclamation.pdf <br />