Laserfiche WebLink
0010 <br /> General Shale <br /> Building The American Dream <br /> View of overburden stockpile on left and stormwater ditch on right looking east <br /> View of entire overburden stockpile and stormwater ditch on upper right looking southeast <br /> 47 <br /> Masi <br /> JUN <br /> a <br /> 1 <br /> ,e i <br /> ` . <br /> w we <br /> 1q,. <br /> The excavation started in October 2018 and the excavation ended December 2018. The excavation of <br /> the ditch will resume in March or April 2019. Once the ditch is constructed and grading is complete, <br />