Laserfiche WebLink
F <br /> U) <br /> 0 <br /> EXISTING 1 FIELD VERIFY <br /> DRAINAGE DITCH CONNECTION TO <br /> --�— I EXISTING TRENCH LINER V - <br /> 1 11 <br /> — - - _ - <br /> `. _-. 30-W 28+00 26* <br /> V / 1 32 00 - <br /> I ?' CUT OFF <br /> I I TRENCH <br /> EXISTING WATER POND <br /> I 1 I I <br /> I <br /> 1 P EXISTING WATER POND I I COMPACTED LINER ALIGNMENT <br /> AS-BUILT LOCATION 3-22-17 <br /> V. <br /> _ <br /> 1 / <br /> _ <br /> 1 so a- '— <br /> ---------- <br /> ------------ <br /> ----- <br /> f�------------ <br /> ----------- <br /> LEGEND <br /> TIGERS RESERVOIR <br /> (AKA NORTH DAHLIA 6 <br /> b 1, �b _.__so�P_.._- `� .0' -------------s�-----------_-- EXISTING CONTOUR(Y INTERVALS) <br /> ,� y^ � <br /> RESERVOIR) j s a s $ I <br /> 1 W <br /> COMPACTED LINER ALIGNMENT ` PROPOSED CONTOURI <br /> AS-BUILT LOCATION 12-1576 <br /> <� EXISTING PAVED ROAD <br /> m <br /> TRENCH EXISTING FENCE <br /> CUT OFF <br /> 1 -/ P EXISTING GRAVEL ROAD <br /> PROPERTY BOUNDARY <br /> -p EXISTING POND AND WATER <br /> 1, � �_/�_ •�, _�d/// � �� � ^,�CP PG��Op,O .,.c---__.- EXISTING OVERHEAD ELECTRIC <br /> TP-1 a TEST PIT LOCATION(DEERE 8 AULT DUNE 2013) <br /> � ,,.E{) /J V CUT OFF V�6FR , TH-104 b BORING LOCATION(DEERE&AULT JUNE 2013) <br /> - J�` \, COMPACTED LINER TRENCH pp rI11�L BORING LOCATION(CTL THOMPSON DATE UNKNOWN) <br /> 2` SLURRY WALL ALIGNMENT) sp �''--� \. ALIGNMENT AS-BUILT <br /> E AS-BUILT LOCATION 12-15-16 &`-EXISTING' -1� 1 LOCATION 2-14-18 8.00 / EXISTING STRUCTURE <br /> i <br /> DRAINAGE_bFTLH 6+p0 - <br /> ' - SECTION CALLOUT: <br /> SECTION LETTER <br /> - _ '\A ,�P _g PAGE WHERE SECTION IS SHOWN <br /> Y - ' - - - <br /> '� `'sm " '� �I 0°' i � -' DETAIL CALLOUT: <br /> j __"_ a — <br /> � FIELD VERIFY <br /> \ CONNECTION TO DETAIL NUMBER <br /> EXISTING TRENCH LINER PAGE VVHERE DETAIL IS SHOWN <br /> SURVEYNOTES: <br /> ^ ( ' 1. EXISTING CONTOUR INFORMATION OBTAINED <br /> FROM OCTOBER 2011 FEMA LIDAR SURVEY DATA. <br /> e ' ' /�>✓ \ \ Pvv 2. EXISTING SITE FEATURES AND PROPERTY LINES <br /> TAKEN FROM ALTA SURVEY. <br /> HATCHERY PIT PHASE 2 SLOPE LINER <br /> REVISIONS <br /> Slope Liner Excavation Plan <br /> NO DESCRIPTION DATE BY <br /> OWNER REVIEW NOV 2018 CJH <br /> AGENCY REVIEW NOV 2018 CJH DEERE & AULT s,� .no.a oc a surtE ms <br /> 100 200 �a mm.iimrc�x aoi.as�t.ibc <br /> SCALE IN FEET DESIGNED BY: CJH APPROVED BY: CJH JOB NO• SHEET: <br /> DRAWN BY ITR DATE: NOV2018 <br /> CONTOUR INTERVAL 2' <br /> oza.oz4.00 5 of 13 <br /> CHECKED BY CJH SCAUE:AS NOTED <br />