Laserfiche WebLink
Attachment No. 1 <br />COST SUMMARY WORK <br /> <br />Task description: MT8 <br />Site: McClane Canyon Mine Permit Action: MT8 Permit/Job#: C1980004 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 12/27/2018 County: Garfield Filename: C004-015 <br />User: TNL <br />Agency or organization name : DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Regrade Mine Bench Areas and Reconstruct <br />Ephemeral Drainages <br />DOZER 1 165.52 $43,044.00 <br />002 Regrade Steep Slope Area South of Shop EXCAVATE 1 15.74 $1,961.00 <br />003 Recontour East Salt Creek Bridge Area EXCAVATE 1 0.19 $24.00 <br />005 Regrade Construction Material Stockpile DOZER 1 2.98 $774.00 <br />006 Spread and Compact Uncompacted Refuse Coal <br />Mine Waste Pile <br />COMPACT 1 6.18 $916.00 <br />007 Place Three Feet of Cover on Coal Mine Waste <br />Pile <br />SCRAPER1 1 24.97 $6,460.00 <br />008 Rip Backfilled and Rough Graded Areas RIPPER 1 9.63 $2,582.00 <br />009 Rip McClane to Munger Haul Road RIPPER 1 0.69 $185.00 <br />010 Rip Construction Material Stockpile RIPPER 1 0.79 $212.00 <br />011 Pull Main Haul Road Fill Material to Base of Cut <br />Slope Bench <br />EXCAVATE 1 20.19 $2,515.00 <br />012 Recontour Main Haul Road Surfaces DOZER 1 32.12 $8,353.00 <br />013 Recontour Main Haul Road Surfaces DOZER 1 16.06 $4,177.00 <br />014 Finish Grade All Backfilled Areas GRADER 1 4.69 $432.00 <br />015 Stream Channel Erosion Protection NA 1 24.00 $57,273.32 <br />016 Backfill and Regrade Sediment Pond, Drying Area <br />and Office <br />DOZER 1 12.52 $3,257.00 <br />017 Regrade Diversion Ditches EXCAVATE 1 0.71 $89.00 <br />018 Regrade Coal Mine Waste Pile Pond DOZER 1 12.04 $3,130.00 <br />019 Replace Topsoil from Stockpile to Mine Bench <br />Area <br />SCRAPER1 1 5.90 $1,527.00 <br />020 Replace Topsoil from Stockpile to Sediment Pond <br />and Office <br />SCRAPER1 1 2.33 $603.00 <br />021 Replace Topsoil from Stockpile to Road from <br />McClane to Munger <br />SCRAPER1 1 4.92 $1,273.00 <br />022 Replace Topsoil from Stockpile to Coal Mine <br />Waste Pile <br />SCRAPER1 1 25.32 $6,550.00 <br />023 Replace Topsoil from Stockpile to Coal Mine <br />Waste Pile Pond <br />DOZER 1 3.58 $930.00 <br />025 Replace Topsoil from Stockpile to Light Use Road DOZER 1 4.46 $1,160.00 <br />026 Seal and Backfill Portals MINESEAL 1 160.00 $26,901.48 <br />027 Seal Monitoring Well GW -1 BOREHOLE 1 6.00 $594.63 <br />028 Demolish and Remove All Structures DEMOLISH 1 330.00 $80,680.79 <br />029 Juniper Woodland Seed Mix REVEGE 1 5.00 $5,893.00 <br />030 Shad scale Shrubland Seed Mix REVEGE 1 3.00 $2,923.00 <br />031 Greasewood Shrubland Seed Mix REVEGE 1 10.00 $11,011.00 <br />032 Reseed Coal Mine Waste Pile REVEGE 1 9.50 $10,460.00 <br />033 Reseed Coal Mine Waste Pile Pond REVEGE 1 2.00 $2,202.00 <br />035 Weed Spraying (Assume 1/3 of the Area 2 Times) REVEGE 1 24.00 $1,127.00