Laserfiche WebLink
036 Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE 1 5.55 $8,133.00 <br />037 Mobilize/Demobilize Equipment for Pond <br />Removal <br />MOBILIZE 1 4.55 $2,407.00 <br />038 Mobilize/Demobilize Equipment for Site <br />Maintenance <br />MOBILIZE 1 9.55 $10,750.00 <br />039 10 year site maintenance SITEMAINT <br />ENANCE <br />1 0.00 $34,540.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />964.68 <br /> <br />$345,050 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $6,970.01 <br />Performance bond: 1.05 Total = $3,623.03 <br />Job superintendent: 482.32 Total = $35,233.48 <br />Profit: 10.00 Total = $34,505.00 <br /> TOTAL O & P = $80,331.52 <br /> CONTRACT AMOUNT (direct + O & P) = $425,381.52 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 Total = 500.00 <br />Engineering work and/or contract/bid preparation: 6.59 Total = $28,032.64 <br />Reclamation management and/or administration: 4.89 $20,801.16 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $129,665.32 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $474,715.32 <br /> <br />