My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-09_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2018-01-09_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:16 PM
Creation date
1/9/2019 4:27:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
1/9/2018
Doc Name
Bond Calculations
From
DRMS
To
American Gypsum
Type & Sequence
TR11
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize reclamation crew and equipment <br />Site: Eagle -Gypsum Mine Permit Action: TRI 1 <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 1/9/2019 County: Eagle <br />User: SJM <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Page 1 of 2 <br />Pennit/Job#: M1984041 <br />Abbreviation: None <br />Filename: M041-006 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Hel er Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: 1 <br />$88.67 <br />$117.55 1 <br />$125.45 <br />NON ROADABLE EQUIPMENT. <br />60.01 <br />$110.70 <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr/uni <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />t <br />fleet <br />Cat D9T - 9SU <br />60.01 <br />$110.70 <br />$125.45 <br />2 <br />$472.30 <br />$250.90 <br />$500.00 <br />Drill/Broadcast <br />25.00 <br />$15.54 <br />$88.67 <br />2 <br />$208.42 <br />$177.34 <br />$500.00 <br />Seeder with <br />Tractor <br />ROADABLE EOUIPMENT: <br />Machine Description <br />Light Duty Pickup, 4x4, 1 T. <br />Crew <br />Subtotals: 1 $680.72 1 $428.24 1 $1,000.00 <br />Subtotals: 1 $77.56 1 $77.56 <br />CIRCES Cost Estimating Software <br />Total Cost/hr/ <br />unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />$19.39 <br />4 <br />$77.56 <br />$77.56 <br />Subtotals: 1 $77.56 1 $77.56 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.