Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 006 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />JOB TIME AND COST <br />Page 2 of 2 <br />EAGLE <br />10.00 miles <br />40.00 mph <br />$3,915.92 <br />$38.78 <br />Total job time: 3.00 Hours <br />Total job cost: $3,955 <br />CIRCES Cost Estimating Software <br />Roadable <br />Roadable <br />Equipment <br />E ui ment <br />Haul Time (Hours): <br />0.25 <br />0.25 <br />Return Time (Hours): <br />0.25 <br />0.25 <br />Loading Time (Hours): <br />0.50 <br />NA <br />Unloading Time (Hours): <br />0.50 <br />NA <br />Subtotals: <br />1.50 <br />0.50 <br />JOB TIME AND COST <br />Page 2 of 2 <br />EAGLE <br />10.00 miles <br />40.00 mph <br />$3,915.92 <br />$38.78 <br />Total job time: 3.00 Hours <br />Total job cost: $3,955 <br />CIRCES Cost Estimating Software <br />