Laserfiche WebLink
of cote <br /> *x 'COLORADO DIVISION TR04i, MINING AND W6T <br /> 1 76 1313 Sherman Street,Room LJW/whe ph(303)866-3567 ''��CC lv ft <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEETD/y/Syc�v N 0 8 2019 <br /> File No.: M- 1994-097 site Name:Spring Creek Pit Ml"1"6ft44 oN <br /> county Montrose TR# (DRMS Use only <br /> Permittee:Oldcastle SW Group Inc. dba United Companies of Mesa County <br /> " OK <br /> Operator(If Other than Permittee): ° <br /> Jason Burkey <br /> Permittee Representative3 la <br /> . a <br /> b <br /> Please provide a brief description of the proposed revision: ° y <br /> Removal of east side berm to create common floor with neighboring pit. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes o I� <br /> to the permit. N �� <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR_is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction p <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 11 Od, 1 12d(l, 2 or 3) $1006 M <br />