Laserfiche WebLink
Daily Report ■ <br /> VLF2 Crushed Ore Stockpile Removal <br /> 475.0106.030 ■ <br /> November 30,2018 <br /> on the slope. CC&V would not haul ore stockpiled on the lower bench until Saturday 12/01. <br /> Ames would be off Saturday and Sunday. <br /> 4.0 PHOTO <br /> I <br /> n <br /> Figure 1. Pushing ore down the lower bench, looking west. <br />