Laserfiche WebLink
NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Crushed Ore Removal <br /> NewFields Project Number: 47S.0106.030 <br /> Date: November 30, 2018 <br /> S M T W T F S <br /> Temperature: Low: 28°F to High:46°F <br /> Weather: Cloudy-Breezy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Jose Armenta 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> Ames continued removing ore material from area between benches at approximately 10020' <br /> and 9960'elevation.The ore is being stockpiled at the lower bench using a CAT D6T LGP dozer <br /> equipped with GPS. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel monitored the ore being pushed down and stockpiled past the toe of <br /> the lower bench, ensured that proper procedures were used to prevent damage to the <br /> underlying synthetic liner. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> Attended the daily morning safety meeting conducted by Ames in the field at 0645 hrs. <br /> Morning discussion with Kevin of Ames. Discussed projected activities for today. Ames to <br /> continue pushing ore material on to the lower bench; will continue maintaining a minimum <br /> thickness over the liner 3.0 ft;would start using small excavator to remove ore along the edge <br />