Laserfiche WebLink
Daily Report <br /> VLF2 Crushed Ore Stockpile Removal <br /> 47S.0106.030 ■ <br /> December 10,2018 <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> Attended the daily morning safety meeting conducted by Ames in the field at 0645 hrs. <br /> Morning discussion with Kevin of Ames. Ames to complete pothole backfill this morning. <br /> Ames would use D6 Cat LGP dozer to grade disturbed surface within the work area. Ames <br /> expected to demobilize from the jobsite by noon today. <br /> 4.0 PHOTO <br /> Figure 1. Ames completing backfill of the potholes with drainage cover fill, looking northwest. <br />