My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-26_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2018-12-26_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:07:54 PM
Creation date
12/27/2018 4:02:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/26/2018
Doc Name Note
Part 2 of 2
Doc Name
Addendum To Application
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F ■NewFields <br /> Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Crushed Ore Stockpile Removal <br /> NewFields Project Number: 475.0106.030 <br /> Date: December 10, 2018 <br /> �- A� ; <br /> S W� T W T F S <br /> ,0 <br /> Temperature: Low: 17°F to High: 42°F <br /> Weather: Clear-Cold <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Jose Armenta 5 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> Ames completed backfill of the potholes using drainage cover fill (DCF) provided by the mine <br /> on the slope area between benches at approximate elevation of 9960' and 10020'. <br /> Ames used a 312 Cat excavator to transfer and backfill the potholes to drainage cover fill <br /> grade. Ames used a D6 Cat LGP equipped with GPS to grade and dress the slope. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel continuously monitored the backfill of the potholes upon inspection of <br /> the synthetic liner. Observed the used of drainage cover fill material being used at all pothole <br /> locations. Observed the material being spread over the synthetic liner to be at the minimum <br /> 2 foot thickness and that care was taken to prevent damage to the underlying synthetic liner <br /> at all times. <br /> NewFields personnel field activity and demobilized upon completion of the potholes backfill <br /> and gracing work on the slope over the drainage cover fill was completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.