My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-26_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2018-12-26_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:07:54 PM
Creation date
12/27/2018 4:02:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/26/2018
Doc Name Note
Part 2 of 2
Doc Name
Addendum To Application
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NewFields <br /> Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek & Victor Gold Mining Company <br /> Project: VLF2 Crushed Ore Stockpile Removal <br /> NewFields Project Number: 475.0106.030 <br /> Date: December 07, 2018 <br /> S M 1 W T S <br /> Temperature: Low: 14°F to High: 32°F <br /> Weather: Clear-Cold <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Jose Armenta 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> Ames completed excavating the potholes to expose the liner at designated locations on slope <br /> area between benches at approximate elevation of 10020' and 9960'. <br /> Ames used a 312 Cat excavator equipped with a bucket with a rubber blade to excavate to <br /> approximately 4-inches above the synthetic liner. Ames provided three spotters using flat <br /> shovels to locate and expose the synthetic liner. <br /> Ames excavated the remaining potholes #2 through #6 and #9 through #16. <br /> CC & V Surveying crew was on site today to as-built survey all the potholing locations (#1 <br /> through #34). <br /> Ames started backfill of the potholes using drainage cover fill (DCF) provided by the mine. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields CQA personnel continuously monitored the pothole excavations ensuring that <br /> proper procedures were used to prevent damage to the synthetic liner. Upon exposure of the <br /> synthetic liner a thorough visual inspection was performed to confirm liner integrity. No <br />
The URL can be used to link to this page
Your browser does not support the video tag.