Laserfiche WebLink
Daily Report >r <br /> VLF2 Crushed Ore Stockpile Removal <br /> 475.0106.030 ■ <br /> November 27,2018 <br /> Monday thru Friday; will work on the removal of the ore and maintain a minimum thickness <br /> over the liner of 2.5 to 3.0 ft.The loading equipment and end dump trucks would be operating <br /> over 12 ft in thickness along the lower bench. <br /> 4.0 PHOTO <br /> 9 <br /> T- <br /> Figure 1. Pushing the ore down the lower bench, looking southwest. <br />