Laserfiche WebLink
â– NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Crushed Ore Stockpile Removal <br /> NewFields Project Number: 475.0106.030 <br /> Date: November 27, 2018 <br /> S M T W T F S <br /> Temperature: Low: 31°F to High: 46°F <br /> Weather: P. Cloudy-Breezy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Jose Armenta 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> Ames started pushing ore material from the area between benches at the approximate <br /> elevation of 10020' and 9960' 1030 hrs. The ore is being stockpiled at the lower bench at <br /> approximate elevation of 9960'. The ore material is being pushed downhill using a CAT D6T <br /> LGP dozer equipped with GPS. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel monitored the ore being pushed down and stockpiled past the toe of <br /> the lower bench,approximate elevation 9960',the ore is being removed to approximately 3ft <br /> thickness over the synthetic liner in preparation for pot holing; ensured that proper <br /> procedures were used to prevent damage to the underlying synthetic liner. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> Attended the CC&V site safety training and orientation 0700-1000 hrs. <br /> Met with Kevin of Ames at 1000 hrs to discuss schedule and projected activities.Ames to start <br /> removing overburden (ore material) between slope benches at approximate elevation of <br /> 9960' and 1020', just north of the mill office building. Ames to work from 0700 to 1700 hrs <br />