Laserfiche WebLink
High Line Canal Co <br /> P.O.Box 800 <br /> 963 Elm Street <br /> Rocky Ford,Co. 81067 <br /> July 11,2006 <br /> Pueblo County Commissioners <br /> Department of Planning and Development <br /> 229 West le Street <br /> Pueblo,Co 81003 <br /> Re: Special Use Permit application Big"G"Gravel pit <br /> Dear Sirs and Madam: <br /> The High Line Canal Co has 3 concerns with this application, other than that we support the <br /> Application. Fist our biggest concern is that#*piling of the overburden does not increase sift run off <br /> during periods of heavy rains. Second is that we would like therm to rye up to the edge of the ditch <br /> using an excavator and pulling ft*material bad towards the top of the hill,and one mining down to#* <br /> elevation of the top of ft canal. Third,vie wart tD make sure dug we always have access to the canal. <br /> l haws meet an sic with talk.Gagliano and voiced our ins and I believe that we can work well with <br /> this ding open. <br /> Sincerely, <br /> [tan Hanrk�ha <br /> Superintendent of the Hoi Line Canal Go <br /> cc Joe Gagliaan o <br /> file(J:\2017\=BigG\Structures\BigG-Eng-eval-Highline.odt) Page 3 of 3 <br />