Laserfiche WebLink
Page 4 of 5 <br /> LAWMA has the following decreed replacement sources that can be utilized for replacement <br /> of the stream depletions associated with this plan: <br /> Water Division 2 <br /> Replacement Source Amount Case No. <br /> Highland Irrigation Company 3,402 of 3,800 shares 02CW181 <br /> Highland Canal Direct Flow 169 of 3,800 shares 1 OCW085 <br /> Keesee Ditch 14.25 cfs of 28.5 cfs 02CW181 <br /> Keesee Ditch 14.25 cfs of 28.5 cfs 05CW052 <br /> Keesee Ditch Article II Account Half of Account 02CW181 <br /> Keesee Ditch Article II Account Half of Account 05CW052 <br /> Fort Bent Ditch Company 1,104 of 11,651.2 shares 02CW181 <br /> Fort Bent Ditch Company 144 of 11,651.2 shares 1 OCW085 <br /> Lamar Canal Company 50 of 26,127 shares 02CW181 <br /> Lamar Canal Company Colorado Parks and Wildlife 15 percent of 4,720 shares 02CW181 <br /> Lamar Canal Company Colorado BeeD 3,477 of 26, 127 shares 02CW181 <br /> Manvel Canal 54 cfs 02CW181 <br /> Manvel Canal Article II Account Entire Account 02CW181 <br /> X-Y Irrigating Ditch 67 cfs of 69 cfs 02CW181 <br /> X-Y/Graham Article II Account Entire Account 02CW181 <br /> Stubbs Ditch 7.2 cfs 02CW181 <br /> Stubbs Ditch Article II Account Entire Account 02CW181 <br /> Sisson Ditch 18 cfs 1OCW085 <br /> Sisson Ditch Article II Account Entire Account 1 OCW085 <br /> John Martin Reservoir Offset Account Transit Loss Varies <br /> 10-Year Credit Deliveries to the Stateline Stateline Credit Varies <br /> Accounting <br /> Table 4 is the proposed monthly accounting form that will be used in this plan. This accounting <br /> form has been slightly modified from the previous accounting form to separate the amount of the <br /> replacement obligation under this plan and from the amount of the replacement obligation under <br /> LAWMA's augmentation plan. The amount of aggregate mined and the meter reading for the dust <br /> control/aggregate washing will be completed by a representative of C&A Holding Company (C&A). <br /> This person is currently Sarah Morrissey, the Account Manager. C&A will e-mail the accounting <br /> form to Randy Hendrix of Hendrix Wai Engineering, Inc. to lag the stream depletions for the <br /> operational uses in this plan and for the well pumping augmented in LAWMA's augmentation plan. <br /> Mr. Hendrix will then include the accounting within his monthly submittal of substitute water supply <br /> plans to the Division 2 Engineer's Office, the District 67 Water Commissioner and Mr. Bill Tyner, the <br /> Assistant Division Engineer— Division 2. A sample of the daily accounting to be used is attached to <br /> this request. <br /> Proposed Term <br /> This renewal request seeks approval for one year beginning May 1, 2018. <br /> Reclamation of Mining Site <br /> After mining and reclamation has been completed, a lined reservoir(s) will be created with a <br /> total surface area of approximately 183 acres. Mining has been completed in the first cell and that <br /> structure is currently included in LAWMA's water court application in Case No. 15CW3067. The new <br /> approximately 183 acre cell would also be included as a place to store water within LAWMA's <br />