Laserfiche WebLink
Page 3 of 5 <br /> Total Consumptive Use <br /> The total amount of groundwater consumptive use from operation of the West Farm Pit during <br /> the proposed term of this plan will be 13.55 acre-feet (2.51 acre-feet of evaporation + 11.04 acre- <br /> feet of moisture content removal). This amount is shown in Table 2. <br /> Mining Stream Depletions <br /> Depletions to the Arkansas River from the mining of aggregate from the gravel pit are lagged <br /> since the centroid of the mining site is approximately 3,300 feet from the river. Lagged stream <br /> depletions were determined using the Integrated Decision Support Group's (IDS) Alluvial Water <br /> Accounting System (AWAS) model, version 1.5.85. A stream depletion factor(SDF) of 88 days' was <br /> used to lag the stream depletions. The SDF of 88 days was used in the prior approval of DRMS-M- <br /> 2008-78 and is maintained in this request. Previous mining operations have been included in the <br /> modeling and the results with the projected mining under this plan are shown in Table 3. The total <br /> stream depletion that will occur during this plan year will be 8.15 acre-feet. <br /> Replacement Water <br /> GP currently owns 284 LAWMA common shares. The proposed allocation for a LAWMA <br /> common share in 2018 has been set at 100%. Therefore, GP must dedicate 9 LAWMA common <br /> shares for augmentation of the lagged stream depletions under this plan. <br /> If GP were to continue operating the gravel pit in the same manner for the next 25-years and <br /> the same monthly total consumptive use from the operational uses then the maximum stream <br /> depletion would occur in the 25th year in the amount of 12.8 acre-feet. While this amount doesn't <br /> quite represent a steady-state condition one must take into account the expected life of the gravel <br /> pit. There is a limited amount of aggregate that can be mined from the existing site. Each year <br /> LAWMA will re-evaluate GP's need for LAWMA shares to ensure that GP has dedicated the proper <br /> amount to any requested renewal of the plan. <br /> Table 3 shows the proposed replacement schedule of the stream depletions in this plan. <br /> LAWMA has been fully-augmenting the entire operation of the West Farm Pit(i.e. evaporative losses <br /> from the dewatering trench and settling pond, water lost as moisture content in the aggregate and <br /> water pumped from the well for gravel washing and dust suppression) within its augmentation plan. <br /> Moving forward, ongoing lagged stream depletions from past operations of the West Farm Pit and <br /> future depletions from use of the well for aggregate washing and dust suppression will continue to <br /> be augmented under LAWMA's augmentation plan. Evaporative depletions from the dewatering <br /> trench and settling pond and water lost as moisture content in the mined aggregate will be replaced <br /> under this plan and future plans pursuant to C.R.S. § 37-90-137(11). <br /> ' Interpolated from"Stream Depletion Factors,Arkansas River Valley, Southeastern Colorado"by C.T,Jenkins and O. <br /> James Taylor(USGS OFR 72-192). <br />