My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-26_REVISION - M2008078 (31)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2018-12-26_REVISION - M2008078 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 2:13:14 AM
Creation date
12/26/2018 3:19:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
12/26/2018
Doc Name Note
Preliminary - Part 2 of 4
Doc Name
Adequacy Review Response
From
J&T Consulting
To
DRMS
Type & Sequence
AM1
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3 ABBREVIATIONS AND DEFINITIONS <br /> A. API -American Petroleum Institute <br /> B. ASTM- American Society for Testing and Materials <br /> C. Slurry Trench-A narrow,vertical-walled trench of specified width excavated by the slurry trench <br /> method and backfilled with specified materials to form a cutoff wall of low permeability. The terms <br /> "Slurry Trench"and"Slurry Wall"are used interchangeably in these specifications. <br /> D. Slurry Trench Method-A method of excavating a narrow,vertical trench using a slurry mixture to <br /> support the trench walls and prevent movement of groundwater into or through the excavated trench. <br /> E. Water-Bentonite Slurry- A stable colloidal suspension of powdered bentonite in water. The terms <br /> "slurry"and "water-bentonite slurry"are used interchangeably in these specifications. <br /> F. Soil-Bentonite(SB)Backfill-A homogeneous mixture of specified soil material, bentonite and water. <br /> The terms"soil-bentonite backfill" and"backfill"are used interchangeably in these specifications. <br /> G. Slurry Trench Specialist- An individual who has had proven and successful experience in slurry trench <br /> construction and is knowledgeable of: (1)the proper methods employed to mix slurry and backfill, (2) <br /> the use,testing and control of bentonite as a slurry, (3)construction equipment, (4)excavation and <br /> backfill operations, and(5)testing for slurry trench quality control. <br /> H. Working Platform- The working platform is the surface of compacted fill and/or excavated surface <br /> from which the slurry wall is constructed. The work platform is to be relatively level, stable. <br /> 1. Supplemental Fines—The soil that contains a significant percentage of fines content(passing the-#200 <br /> sieve or .075 min in the largest dimension)that is added to the excavated soil for the purpose of <br /> increasing the overall fines content of the soil-bentonite backfill. <br /> J. Key Depth- The depth to which the slurry trench is excavated into less weathered suitable bedrock <br /> providing the connection between the slurry wall and the less weathered bedrock. <br /> 1.4 SUBMITTALS <br /> A. The following information shall be submitted at least 4 weeks prior to construction. <br /> 1. Qualifications of Contractor <br /> a. The Contractor, shall submit evidence including resumes and references that he or his <br /> subcontractor is experienced and competent to construct a soil-bentonite slurry trench. The <br /> slurry trench company shall have at least five years of prior experience in constructing slurry <br /> walls,with at least five 'SB slurry walls of similar scope and magnitude. The Contractor shall <br /> have sufficient competent experienced personnel to carry out the operations specified. <br /> i. In particular, a slurry trench specialist hired by the Contractor shall supervise the <br /> construction, slurry preparation, and Contractor's quality control. The slurry trench specialist <br /> shall have at least three years of experience and/or three projects in successful construction of <br /> slurry walls,with at least two SB slurry walls of similar scope and magnitude. <br /> b. The company name, key contact, and qualifications of the Contractor's off-site laboratory shall <br /> be submitted. The laboratory will have previous experience with slurry wall backfill materials, <br /> experienced laboratory technicians,and flexible wall permeability testing equipment. <br /> 2. Work Plan- The Contractor shall submit a detailed operating plan describing his proposed <br /> construction equipment, procedures, and schedules. This shall include, but not be limited to,the <br /> Contractor's plan for: <br /> a. Coordinating the construction, maintenance and removal of working platforms, mixing pads, <br /> and haul roads with the Owner, general contractor or other contractors on site. <br /> b. Equipment set-up and site use layout including storage areas, haul roads and work platform <br /> dimensions. <br /> 31 66 17-2 <br /> Prowers Aggregate Operators, LLC <br /> West Farm Pit Phase 2 Slurry Wall Soil-Bentonite Slurry Walls <br />
The URL can be used to link to this page
Your browser does not support the video tag.